In addition to the tender for the construction of the construction road for the construction of the Salinenbad, preparatory work is now also underway at the Salinental outdoor pool. Two garages have been loaded with a crane and have now been moved to another site belonging to the Kreuznacher Stadtwerke Group.

By Aziz